Skip to main content

Group Wants I-84 Demolished in Hartford, CT

Recently, John Norquist, a former mayor of Milwaukee, Wisconsin, was in Hartford to discuss and promote the idea of knocking down an I-84 viaduct that runs through the city.  He has been working with a citizen's advocate group called the Hub of Hartford in order to discuss alternate plans for the aging viaduct that runs west of downtown Hartford.  

Currently, ConnDOT has plans of investing $100 million towards fixing the viaduct for a 20 year period, while the Hub of Hartford suggests bringing Interstate 84 down to ground level.  Another idea is to have the highway go around the city instead of through it, or sinking the highway underground.  Norquist suggests knocking down the freeway in order to free up real estate and promote business in the area.

My take on this is that if I-84 through Hartford gets altered, I-84 would be rerouted on a different route, likely I-691 and I-91, or via CT 72 in New Britain, CT 9 and I-91.  Real estate prices in Connecticut are likely too expensive for ConnDOT to want to build a new alignment around Hartford, plus there has been a strong sentiment against building new highways in the past.  Plus there are traffic flow problems to consider, as I-84 traffic can get very heavy west of Hartford (possibly due to the large number of exits in the area - see I-95 between Bridgeport and Greenwich for another example).  This would shift the issue of traffic flow onto other roads.

I believe that in the end, the status quo will be maintained as far as I-84 is concerned, but it is nice to see the ball get rolling for possible improvements.

Developers contemplated doing the same thing in Syracuse, wanting to tear down the elevated portion of I-81 in downtown Syracuse, so they could bring the Syracuse University campus socially closer to the downtown Syracuse community.  The proposal pops up on occasion, but I am not sure how serious of a proposal it is.

A similar idea is also mentioned for the Inner Loop in Rochester, NY, with the 
notion of removing the depressed highway and turning it into an at-grade boulevard.

http://www.wfsb.com/news/15904065/detail.html - WFSB TV-3 article
http://www.hartfordadvocate.com/article.cfm?aid=7156 - Hartford Advocate article

Comments

Anonymous said…
If demolition of I-84 in Hartford, CT were to commence, the unused stacks of the former I-291 would have to be considered. This would provide traffic to residents in the towns of Avon, Simsbury, and Bloomfield respectively. If the cancelled I-284 were completed, it would have connected I-91 traffic westbound to I-84 via Bushnell Park.

http://daredevyl83.blogspot.com

Popular posts from this blog

Interstate 40's Tumultuous Ride Through the Pigeon River Gorge

In the nearly 60 years Interstate 40 has been open to traffic through the Pigeon River Gorge in the mountains of Western North Carolina, it has been troubled by frequent rockslides and damaging flooding, which has seen the over 30-mile stretch through North Carolina and Tennessee closed for months at a time. Most recently, excessive rainfall from Hurricane Helene in September 2024 saw sections of Interstate 40 wash away into a raging Pigeon River. While the physical troubles of Interstate 40 are well known, how I-40 came to be through the area is a tale of its own. Interstate 40 West through Haywood County near mile marker 10. I-40's route through the Pigeon River Gorge dates to local political squabbles in the 1940s and a state highway law written in 1921. A small note appeared in the July 28, 1945, Asheville Times. It read that the North Carolina State Highway Commission had authorized a feasibility study of a "...water-level road down [the] Pigeon River to the Tennessee l...

Massena Center Suspension Bridge

The Massena Center Bridge, also known as the Holton D. Robinson Bridge, has had quite the tumultuous history. Situated on the Grasse River just east of Massena, New York in the hamlet of Massena Center, the Massena Center Bridge is a reminder of the efforts the community has made in order to connect over the river. The first and only other known bridge to be built at Massena Center was built in 1832, but that bridge was never long for this world. During the spring of 1833, the Grasse River dammed itself due to an ice dam, flooded and lifted the bridge off its foundation, destroying the bridge in the process.  The floods were frequent in the river during the spring, often backing up the river from Hogansburg and past Massena Center, but not to nearby Massena. After the first bridge disappeared, local residents had to resort to traveling seven miles west to Massena to cross the next closest bridge, and that was no easy task for a horse and buggy. However, it was many decades befo...

The Dead Man's Curve of Interstate 90 and Innerbelt Freeway in Cleveland

"Dead Man's Curve" refers to the transition ramp Interstate 90 takes between Cleveland Memorial Shoreway onto the Innerbelt Freeway in downtown Cleveland, Ohio.  Said curve includes a sharp transition between the two freeways which is known for a high rate of accidents.  Currently the curve (not officially named) has a 35 MPH advisory speed and numerous safety features intended to mitigate crashes.  When the Interstate System was first conceived during 1956, Interstate 90 was intended to use the entirety Cleveland Memorial Shoreway and connect to the Northwest Freeway through Lakewood.  The Innerbelt Freeway was initially planned as the northernmost segment of Interstate 71.  The extension of Cleveland Memorial Shoreway west of Edgewater Park was never constructed which led to Interstate 90 being routed through the Innerbelt Freeway.   Part 1; the history of Cleveland's Innerbelt Freeway and Deadman's Curve The Federal Aid Highway Act of 1956 was signe...