Skip to main content

Washington State Route 509

Washington State Route 509 is an approximately 35 mile state highway spanning from WA 99 in Seattle southwest to I-705 in Tacoma.  The routing of WA 509 varies from freeway segments, to major surface arterial roadways and even to coastal bluff roads.  While certainly not the fast way between Seattle and Tacoma it does serve as a semi-scenic alternate to the topical slog of I-5.






I began my drive on WA 509 heading southbound.  With that being the case I approached WA 509 on WA 99 southbound.  WA 509 is signed as "To" route via WA 99 as it crosses over the Duwamish Waterway.  WA 99 crosses the Duwamish Waterway on the First Avenue South Bridge.  The two spans of the First Avenue South Bridge were completed in 1956 and 1998, both are draw spans.   Oddly WA 99 traffic is directed to exit on the First Avenue South Bridge while WA 509 continues ahead as a freeway.










The next major junction on WA 509 southbound is at WA 518 near SeaTac International Airport.  WA 518 connects SeaTac International Airport and I-5 while WA 509 continues to Normandy Park in addition to Des Moines.







WA 509 becomes a surface route in southern Burien as the freeway segment ends.  WA 509 runs on Des Moines Memorial Drive westward where it turns south again on 1st Avenue.  This particular segment of WA 509 is incredibly poorly signed and I had to refer to street blades to ensure that I was actually on the highway.





WA 509 straddles Normandy Park and Des Moines on 1st Avenue before turning over Des Moines Creek on 216th Street.





In downtown Des Moines WA 509 runs on Marine View Drive, again there is almost no indication it is a state highway.




WA 509 meets WA 516 at Kent-Des Moines Road.  WA 509 technically multiplexes WA 516 east to WA 99 at Pacific Highway. 


WA 509 splits away from WA 99 at Dash Point Road in Federal Way.





WA 509 becomes a coastal bluff highway on Dash Point Road.  The roadway is curvy but nothing too extreme as it continues westerly to Dash Point State Park.













WA 509 crosses a stream in Dash Point State Park enters Pierce County and the community of Dash Point.






As WA 509 enters the City of Tacoma there is a overlook of Commencement Bay, the Port of Tacoma and downtown Tacoma.




WA 509 continues west along the waters of Commencement Bay where it becomes a freeway again at Port of Tacoma Road. 









WA 509 continues west over the Puyallup River and the Thea Foss Waterway on the 21st Street Bridge to a terminus with I-705 in downtown Tacoma. 






Before the 1964 Washington State Highway renumbering the route of WA 509 was assigned two different numbers; WA Primary State Highway 1V and 1K.  WA Primary State Highway 1V carried traffic from downtown Tacoma to US 99 in Federal Way.  WA PSH 1V actually continued along the coastline from Pacific Highway to WA PSH 1K in Des Moines.  WA PSH 1K ran from US 99 in Des Moines to US 99 in Seattle.  Both WA PSH 1V and 1K were both created in 1937, the map below from 1956 shows them as they were before the 1964 renumbering.


Update 6/1/18:  According to thefraze_1020 on AAroads the alignment of WA 509 was shifted onto a multiplex of WA 516 and WA 99 in 1992.


Comments

Unknown said…
Thank you! This has been a great help. I'm here from Eastern WA to attend UW and if all the Greater Seattle highway regions I find the Southern Regions between Seattle and Tacoma to be the most confusing.
Is "509" also known as West Seattle Freeway? (Unofficially). And does the roadbed underneath date from BEFORE the Freeways came in?
I'm familiar with many of the 1910s and 1920s historical routes but have overlooked 509 as a Freeway era route entirely.

Popular posts from this blog

Trimmer Springs Road (Fresno County)

Trimmer Springs Road is an approximately forty-mile rural highway located in Fresno County.  The corridor begins near in California State Route 180 in Centerville and extends to Blackrock Road at the Kings River in the Sierra Nevada range near the Pacific Gas & Electric Company town of Balch Camp. The roadway is named after the former Trimmer Springs Resort and was originally constructed to facilitate access to the Sanger Log Flume.  Trimmer Springs Road was heavily modified and elongated after construction of Pine Flat Dam broke ground in 1947.   Part 1; the history of Trimmer Springs Road Much of the original alignment of Trimmer Springs Road was constructed to facilitate access to the Sanger Log Flume.   The  Kings River Lumber Company  had been established in 1888 in the form of a 30,000-acre purchase of forest lands in Converse Basin.  This purchase lied immediately west of Grant Grove and came to be known as "Millwood."  The co...

When was Ventura Avenue east of downtown Fresno renamed to Kings Canyon Road? (California State Route 180)

California State Route 180 was one of the original Sign State Routes designated in August 1934.  The highway east of Fresno originally utilized what was Ventura Avenue and Dunlap Road to reach what was then General Grant National Park.  By late year 1939 the highway was extended through the Kings River Canyon to Cedar Grove.   In 1940 General Grant National Park would be expanded and rebranded as Kings Canyon National Park.  The Kings Canyon Road designation first appeared in publications circa 1941 when the California State Route 180 bypass of Dunlap was completed.  Kings Canyon Road ultimately would replace the designation of Dunlap Road from Dunlap to Centerville and Ventura Avenue west to 1st Street in Fresno.   The Kings Canyon Road would remain largely intact until March 2023 when the Fresno Council designated Cesar Chavez Boulevard.  Cesar Chavez Boulevard was designated over a ten-mile corridor over what was Kings Canyon Road, remaini...

Interstate 99 at 30

When it comes to the entirety of the Interstate Highway System, Interstate 99, when fully completed, is nothing more than 161 miles of a roughly 48,000-mile system (0.3% of total length).  Yet, to more than just a handful of people, the number '99' rubs them the wrong way. Interstate 99 follows the path of two US Highway Routes - US 220 from the Pennsylvania Turnpike in Bedford north to Interstate 80 and then to US 15/Interstate 180 in Williamsport.  It then follows US 15 from Williamsport north to Interstate 86 in Corning, New York. Interstate 99 runs with US 220 through much of Central Pennsylvania. (Doug Kerr) US 220 from Cumberland, Maryland to Interstate 80 and US 15 north of Williamsport were designated part of the Appalachian Highway System in 1965.  Construction to upgrade both corridors progressed steadily but slowly.  In 1991, the two corridors were included as a National High Priority Corridor.  The route from Cumberland to Corning consisted of High P...