Skip to main content

Oregon Route 62 Rogue Valley Expressway

Much of Oregon Route 62 recently in the Medford Area has been moved from Crater Lake Highway to the Rogue Valley Expressway. 

The Rogue Valley Expressway is a 4.5 mile segment of Oregon Route 62 ("OR 62") which is a limited access bypass of Crater Lake Highway.  The Rogue Valley Expressway begins just south of OR 140 and terminates about a half mile from Interstate 5 ("I-5").  The Rogue Valley Expressway was intended to expedite travel between Medford and White City.  


Part 1; the background of the Rogue Valley Expressway

Much of the history of the Rogue Valley Expressway is discussed in the May issue of ODOT Moving Ahead.  According to ODOT Moving Ahead concepts to move OR 62 from Crater Lake Highway between Medford and White City began to emerge in the 1990s  In 2004 project teams met to narrow down the possible design concepts which would be evaluated for Environmental Impact Statements.  The Rogue Valley Expressway was funded in 2009 via $120 million dollars set aside as part of the Oregon Jobs & Transportation Act.  Construction of the Rogue Valley Expressway began in May 2016 and would open to traffic as mainline OR 62 in May 2019.  



 

Part 2; a drive on the Rogue Valley Expressway

As noted above OR 62 joins the Rogue Valley Expressway just south of OR 140 and White City.  OR 62 westbound makes a right turn off of Crater Lake Highway onto the Rogue Valley Expressway.  The former surface alignment of OR 62 on Crater Lake Highway is signed OR 62 Business.  




Despite being fully limited access and not having any interchanges the Rogue Valley Expressway is signed at a typical Oregon 55 MPH urban freeway speed.


The Rogue Valley Expressway makes a southward jog towards Medford and enters the City Limits at Vilas Road overpass. 





The Rogue Valley Expressway skirts the eastern edge of Rogue Valley International-Medford Airport and merges back into Crater Lake Highway approaching I-5. 









Comments

Unknown said…
This comment has been removed by the author.
According to the first draft map, the bypass was going to extend further up current OR-62 to White City. There would have been interchanges at Vilas Road, OR-62 (at or near the current northern end of the bypass) and OR-140 (as a cloverleaf). The 2013 FEIS selected a different longer routing: White City would be bypassed to the west to Dutton Road, eliminating the 140 cloverleaf but adding partial interchanges at existing OR-62 at both ends of White City. The interchange at Vilas road also changed from an SPUI to a tight diamond interchange. At some point, the project was rolled back or split into phase; the Vilas Road interchange was removed, and the bypass now ends at OR-62 between Corey Road and Gregory Road.

Popular posts from this blog

Interstate 40's Tumultuous Ride Through the Pigeon River Gorge

In the nearly 60 years Interstate 40 has been open to traffic through the Pigeon River Gorge in the mountains of Western North Carolina, it has been troubled by frequent rockslides and damaging flooding, which has seen the over 30-mile stretch through North Carolina and Tennessee closed for months at a time. Most recently, excessive rainfall from Hurricane Helene in September 2024 saw sections of Interstate 40 wash away into a raging Pigeon River. While the physical troubles of Interstate 40 are well known, how I-40 came to be through the area is a tale of its own. Interstate 40 West through Haywood County near mile marker 10. I-40's route through the Pigeon River Gorge dates to local political squabbles in the 1940s and a state highway law written in 1921. A small note appeared in the July 28, 1945, Asheville Times. It read that the North Carolina State Highway Commission had authorized a feasibility study of a "...water-level road down [the] Pigeon River to the Tennessee l

Ghost Town Tuesday; Mannfield, FL and the stairway to Hell

Back in 2015 I went searching the Lecanto Sand Hills for the original Citrus County Seat known as Mannfield.  Unlike Centrailia in Hernando County and Fivay in Pasco County I did find something worth seeing. Mannfield is located in the Lecanto Sand Hill section of Withlacoochee State Forest somewhat east of the intersection of Citrus County Route 491 and Mansfield Road. Mannfield was named after Austin Mann and founded in Hernando County in 1884 before Citrus County Split away.  In 1887 Citrus County was split from northern Hernando County while Pasco County was spun off to the south.  Mannfield was selected as the new Citrus County seat due to it being near the county geographic center.  Reportedly Mannfield had as many as 250 people when it was the County Seat.  The town included various businesses one might include at the time, even a sawmill which was common for the area.  In 1891 Citrus County voted to move it's seat to Inverness which set the stage for the decline of M

The Lincoln Highway Bridge Rails

The Lincoln Highway Bridge Rails are presently located at the eastbound truck parking area near Mile Marker 6 of Interstate 80 in Washoe County, Nevada.  These bridge rails were part of the Mogul Road culvert which was completed in 1914 as part of the Northern Branch of the Lincoln Highway.  The railings were intended to be a common feature of the Lincoln Highway but ultimately were only installed at one other location in Tama, Iowa.  During 1926 US Route 40 would be carried for a time through the Lincoln Highway Bridge Rails.  The bridge rails were abandoned during a realignment of US Route 40 during the 1930s but were ultimately salved during the construction of Interstate 80 in 1970.  Part 1; the history of the Lincoln Highway Bridge Rails During 1912 Indiana Businessman Carl G. Fisher conceptualized the Lincoln Highway as a major transcontinental Auto Trail.  The Lincoln Highway was formally dedicated on October 31, 1913, and was aligned west of Fallon via split branches over the S