Skip to main content

Some Massachusetts Highway Photos

I took a trip north from North Carolina to Massachusetts for the Fourth. The route up, if you're curious was my 'land route' vs. a 'coastal route'. It is basically taking NC/VA 86 to US 29 north through central Virginia to US 17, then getting over to US 15 in MD and into PA. The rest of PA via I-83, I-81 and I-84. Then continuing on I-84 through NY and into CT then I-691, CT 66, CT 16, CT 2, I-395, and the CT turnpike stub to get to RI where it was US 6 East, I-295 North to MA getting on I-95 north to I-93/US 1 north.

Since there wasn't anything too new or interesting going up I saved my photos for new signs that had been put up along MA/Pilgrims Highway between Exits 11 and 20 since my last visit. The original signs from Exit 12 to 15 were ground mounted. The new ones are also except at the interchanges themselves where they've been replaced by cantilevered signs such as:the one above for Exit 12 MA 139. Some control cities on some of the signs has changed, such as the following for Exit 14, MA 228:
The original destinations listed were Rockland and Nantasket. Hingham was on a secondary destination sign, which now lists Nantasket. The other noted change is for the following exit 15, which originally northbound only listed S. Hingham, S. Weymouth. It is now:
They also changed the wording for Exit 19 which simply said 'Quincy, T station. Many motorists thought the sign implied one destination, the Quincy Center MBTA station, which it did not. It was replaced with the following with the addition of Burgin Parkway which goes to Quincy Center and the T station (Quincy Adams) separated by a line:
The most interesting signage is the replacements for the I-93 interchange, Exit 20. Individual signage for I-93 North and South has been replaced (or will be replaced, the 1 mile sign seen on Steve Anderson's BostonRoads site was still up as of July 20) by diagrammatic signage:
The other most noticeable change is the inclusion of only the interstate routes, not the other highway designations (US 1, MA 3) from the signs. This is due to past MassHighway signage practices. For a greater explanation of this and to see additional Exit 20 signage and also larger versions of the photos here and additional ones, please go to my Massachusetts Highway Photos Page.

Some other Mass. highway notes, no photos unfortunately:
With the replacement of the Sagamore rotary with an interchange, MA 3 northbound is Exit 1A off of US 6 and US 6 East exits itself as Exit 1B. The MA 6A exit both ways is Exit 1C.
MassHighway had a project that was repaving the SE Expressway from Savin Hill to the Braintree Split. At its conclusion a sign replacement project will start along the same section and continue along I-93 to Randolph this fall ( have a photo of a sign to be replaced on my photo page).
There is a cutout US 1 shield at the I-93 end of the South Boston Haul Road pointing to the ramp to I-93 south, the MA 3 sign is missing.
The I-93/US 1 North Mass. Green signs at Columbia Road have disappeared, they still exist at the southbound ramp.
They have added an overhead South I-93/US1/MA 3 small overhead sign south of the Mass. Ave exit, and have an additional overhead sign assembly with space for one about 1/4 mile south of that.
The Big Dig tunnel ramp to I-93 South from Leverett circle was the only ramp that included additional signs for US 1 and MA 3 posted on the BGS support poles.

The route back was basically the reverse as the way up, except I continued on I-81 South through Virginia to I-64 then I-64 East back to US 29. I also took US 29 further south to Greensboro so I could check on I-74 progress for my previous post.

If there are other questions about what I may have seen on my trip, let me know.

Comments

Steve A said…
A few weeks ago I finally got to try the Burgin Pkwy. exit, after it was re-signed from the freeways. Well, guess what - the old signs are still up on the exit. As a sign guy, I thought it was worth it.

Popular posts from this blog

Interstate 40's Tumultuous Ride Through the Pigeon River Gorge

In the nearly 60 years Interstate 40 has been open to traffic through the Pigeon River Gorge in the mountains of Western North Carolina, it has been troubled by frequent rockslides and damaging flooding, which has seen the over 30-mile stretch through North Carolina and Tennessee closed for months at a time. Most recently, excessive rainfall from Hurricane Helene in September 2024 saw sections of Interstate 40 wash away into a raging Pigeon River. While the physical troubles of Interstate 40 are well known, how I-40 came to be through the area is a tale of its own. Interstate 40 West through Haywood County near mile marker 10. I-40's route through the Pigeon River Gorge dates to local political squabbles in the 1940s and a state highway law written in 1921. A small note appeared in the July 28, 1945, Asheville Times. It read that the North Carolina State Highway Commission had authorized a feasibility study of a "...water-level road down [the] Pigeon River to the Tennessee l

Mines Road

Mines Road is an approximately twenty-eight-mile highway located in the rural parts of the Diablo Range east of the San Francisco Bay Area.  Mines Road begins in San Antonio Valley in Santa Clara County and terminates at Tesla Road near Livermore of Alameda County.  The highway essentially is a modern overlay of the 1840s Mexican haul trail up Arroyo Mocho known as La Vereda del Monte.  The modern corridor of Mines Road took shape in the early twentieth century following development of San Antonio Valley amid a magnesite mining boom.  Part 1; the history of Mines Road Modern Mines Road partially overlays the historic corridor used by La Vereda del Monte (Mountain Trail).  La Vereda del Monte was part of a remote overland route through the Diablo Range primarily used to drive cattle from Alta California to Sonora.  The trail was most heavily used during the latter days of Alta California during the 1840s. La Vereda del Monte originated at Point of Timber between modern day Byron and Bre

Interstate 210 the Foothill Freeway

The combined Interstate 210/California State Route 210 corridor of the Foothill Freeway is approximately 85.31-miles.  The Interstate 210/California State Route 210 corridor begins at Interstate 5 at the northern outskirts of Los Angeles and travels east to Interstate 10 in Redlands of San Bernardino County.  Interstate 210 is presently signed on the 44.9-mile segment of the Foothill Freeway between Interstate 5 and California State Route 57.  California State Route 210 makes up the remaining 40.41 miles of the Foothill Freeway east to Interstate 10.  Interstate 210 is still classified by the Federal Highway Administration as existing on what is now signed as California State Route 57 from San Dimas south to Interstate 10.  The focus of this blog will mostly be on the history of Interstate 210 segment of the Foothill Freeway.   Part 1; the history of Interstate 210 and California State Route 210 Interstate 210 (I-210) was approved as a chargeable Interstate during September of