Skip to main content

New Exit Signs on Durham Freeway (NC 147)

Recently I posted to SERoads about an NCDOT press release regarding the replacement of interstate exit signs in Mecklenburg County. According to the press release "New signs with reflective sheeting will be installed, improving reflectivity and removing the need for lighting on the sign structure. The completion date is September 3."

New signs will be installed in the following locations:

  • I-77, Exits 1-23
  • I-85, Exits 27-42
  • I-485, Exits 1 and 32-67
  • I-277, Exits 1 and 2
Well, as it turns out, NCDOT has been for the last week installing similar signs (currently only on overhead structures) on the Durham Freeway, mostly southbound. I decided it was easier to show examples of the new signs by driving around Durham instead of traveling to Charlotte:

Here's a couple of the new signs at Exit 16A for US 15/501 North:
A closer look at the next sign for Hillandale Road reveals the light fixtures formerly at the bottom of the sign have been removed:
Sign changes have also occurred further south the last two days towards downtown Durham:
These signs changes are somewhat bittersweet for me, since the old ones were the first signs I saw heading south on the Freeway from my first apartment in Durham on Swift Road. The Freeway ended at Erwin Road at that time and the Swift Road southbound off ramp was the first exit ramp heading south. Exit 13 is also one of the ways to get to the Durham Bulls ballpark.

It appears they haven't quite finished installing the signs south of the city at Briggs Road, yet:
Notice no exit tab over the Briggs Avenue South sign (with, like for route numbers, the larger first letter in the direction label) and the new NC 147 sign still has lights installed. The placement of the exit tab on a separate sign makes it easier to remove for changes. Will there be changes in exit numbers when the Triangle Parkway, an extension of NC 147, is built? MassDOT is now doing the same thing with their new signs in case the FHWA refuses to exempt them from replacing their current consecutive exit numbers scheme with milepost based numbers.

Lastly, since I was there, I am throwing in a photo of the new pedestrian bridge near Alston Avenue completed earlier this spring:
They have posted a couple new signs northbound also. I'll wait though until the project is finished to take a look at those.

Comments

Anonymous said…
Just wanted to point out that they have propagated the error on the Exit 12 sign--that is US 15/US 501 BUSINESS but there's no mention of that fact...
Anonymous said…
I got some of the new sigh replacements when i was in Charlotte. Here is the link.
http://www.flickr.com/photos/azehner/4822047574/
BrentWhite said…
I-77 except for a handful of signs has been upgraded now.

I-85 has been upgraded from Exit 27 (Southbound only) to I-77.
Exit Signs said…
@Brent
Yes i noticed that it has been upgraded now.

Popular posts from this blog

Interstate 40's Tumultuous Ride Through the Pigeon River Gorge

In the nearly 60 years Interstate 40 has been open to traffic through the Pigeon River Gorge in the mountains of Western North Carolina, it has been troubled by frequent rockslides and damaging flooding, which has seen the over 30-mile stretch through North Carolina and Tennessee closed for months at a time. Most recently, excessive rainfall from Hurricane Helene in September 2024 saw sections of Interstate 40 wash away into a raging Pigeon River. While the physical troubles of Interstate 40 are well known, how I-40 came to be through the area is a tale of its own. Interstate 40 West through Haywood County near mile marker 10. I-40's route through the Pigeon River Gorge dates to local political squabbles in the 1940s and a state highway law written in 1921. A small note appeared in the July 28, 1945, Asheville Times. It read that the North Carolina State Highway Commission had authorized a feasibility study of a "...water-level road down [the] Pigeon River to the Tennessee l

Ghost Town Tuesday; Mannfield, FL and the stairway to Hell

Back in 2015 I went searching the Lecanto Sand Hills for the original Citrus County Seat known as Mannfield.  Unlike Centrailia in Hernando County and Fivay in Pasco County I did find something worth seeing. Mannfield is located in the Lecanto Sand Hill section of Withlacoochee State Forest somewhat east of the intersection of Citrus County Route 491 and Mansfield Road. Mannfield was named after Austin Mann and founded in Hernando County in 1884 before Citrus County Split away.  In 1887 Citrus County was split from northern Hernando County while Pasco County was spun off to the south.  Mannfield was selected as the new Citrus County seat due to it being near the county geographic center.  Reportedly Mannfield had as many as 250 people when it was the County Seat.  The town included various businesses one might include at the time, even a sawmill which was common for the area.  In 1891 Citrus County voted to move it's seat to Inverness which set the stage for the decline of M

The National Road - Pennsylvania - Great Crossings Bridge and Somerfield

West of Addison, US 40 crosses the Youghiogheny River at what once was the town of Somerfield.  When crossing the current modern two lane bridge, you many not realize that it is actually the third to cross the Yough at this site.  The first - a stone arch bridge - was known as the Great Crossings Bridge.  Built in 1818, this three arch bridge was part of the original National Road.  The name Great Crossings comes from the men who forded the Youghiogheny here - George Washington and George Braddock. (1)  If you cross the bridge at the right time, this historic bridge and what was once the town of Somerfield will appear out from underneath this massive man-made lake. Historical Postcard showing the 'Big Crossings' bridge and Somerfield.  Image submitted by Vince Ferrari. The Great Crossings Bridge was located in the town of Somerfield.  Somerfield, originally named Smythfield until 1827, would develop as a result of the National Road. (1)  Somerfield would go through va