Is the often rumored and talked about I-95 toll proposal going to happen in NC? Well, it just might.  Last week, the FHWA gave preliminary approval to NCDOT to be one of three pilot projects that will allow tolling of existing free Interstates to finance much needed and very expensive rehabilitation and improvement projects.

Over the past week and a half, NCDOT has held Public Information Hearings on the proposal covering everything to the widening of the highway, reconfiguration of interchanges, and of course tolling.  These meetings are being held in each of the counties Interstate 95 traverses through in North Carolina.

I went to the meeting held in Wilson on Tuesday, February 21st.  This was actually the first time I personally have ever attended a public information meeting on any type of highway or infrastructure project.  Billy Riddle was also in the area so he joined along.

We arrived at about 5:30.  And by the looks of the sign-up sheets there had been about 25-30 people that had arrived since the start of the session at 4 pm.  We were given a handout with general information about the project - and a magnet promoting the project's website, facebook page, and twitter feed.



We sat through a five minute introductory video - and then went into a side conference room where we were able to see some conceptual details about the project and speak to NCDOT and other personnel involved in the project to this date.



We learned quite a few things:
  • The cost of the project is estimated at $4.4 billion.  If no tolls were to be used, it would take at least 60 years to do the entire rebuild, widening, interchange improvements at current funding levels.
  • NCDOT considered building an entire new alignment of all or parts of Interstate 95 during the preliminary study process.
  • Of the 185 bridges on I-95 in NC nearly half of them (88) need immediate repair and/or replacement within the next ten years.
  • 35 locations need improved sight distance
  • 45 ramps need longer acceleration and/or decelerations
  • 22 locations need additional distance between interchanges
  • 20 % of traffic entering NC at the VA line drive completely through the state into South Carolina.
  • Between 45-50% of all vehicles on I-95 in North Carolina are out of state.
As for details of what the improved I-95 would include:
  •  95 will have eight lanes from Exit 31 (NC 20/St. Pauls) to Exit 81 (I-40)
  • The rest of 95 from the SC border to Exit 31 and from I-40 to the Virginia border will have six lanes
  • Construction will be in two phases over 20-25 years.  
    • Phase 1: Widen to eight lanes from Exit 31 to 81 and widen to six lanes from Exit 20 (NC 211/Lumberton) to Exit 31.  This is scheduled to begin in 2015-16.
    • Phase 2: Widen to six lanes the remainder of I-95 and make additional bridge and safety improvements.
  • The construction will be a design-build project.
  • Unlike what was reported over a year ago, none of the existing interchanges on I-95 will be removed.  Some in the Dunn and Benson area may be combined into one larger interchange but none will be removed.
  •  No major changes will be made to the freeway to freeway interchanges with I-295, I-40, I-74, US 64 and US 264.
Now for the most controversial part - the tolls:
  • Tolling will begin in 2019.
  • Tolling will be 100% Electronic or bill by mail.  Similar to the Triangle Expressway and the NC Turnpike Authority.
  • The preliminary toll rate will be $19.20 for a car driving the entire route. Or about 11 cents per mile.  This of course will be higher for trucks.  
  • Electronic toll gantries will be places at an average of once every 20 miles.  However, they can be as few as 16 miles apart or as much as 22 miles apart.
  • Toll gantries will be placed on ramps before and after each toll gantry to capture tolls from anyone trying to skip the mainline gantries.  These travelers would be charged a 10 mile toll.
  • Discounted rates or annual passes are being considered.  They have received numerous comments and suggestions for lower commuter rates.  This would be similar to discounted "local" tolls that other states like Maine and West Virginia have done currently or in the past.
  • If sections of I-95 have not been improved - there will be temporary toll gantries placed in the vicinity of the permanent toll barriers.
Commentary:

First, I am in favor of the toll proposal.  Construction projects are getting more involved and more costly.  And with the amount of our Interstate highways let alone our entire infrastructure reaching middle age and retirement - there's a lot of projects that need to be done and not a lot of money out there let alone money you can count on.  Toll roads aren't going to get voted homecoming queen.  In fact if a transportation forum could be a possible barometer, a number of out-of-state residents and truck drivers will consider bypassing I-95 in NC altogether. And there are already local residents protesting the tolls.

However, I-95 needs rebuilt, widened, made safer and it needed it yesterday.  Out of state drivers who are either continuing to destinations south or to our beaches will be paying a large portion of the bill. But that doesn't mean concerns that local drivers shouldn't get a break.  In my comments, I mentioned that a discounted toll should be considered and offered to residents living in any of the counties that I-95 travels through.  I am not sure how much of a discount but it should be significant and not bear an extreme burden on those living in some of the poorer areas of the state.

I also suggested that some of the interchanges with routes that tourists use to get to the coast be considered for tolls. US 158, US 264, US 64, US 70, I-40, NC 87, and US/I-74.  This may be tougher to implement - and may even be a bad idea - but if North Carolina residential tag holders would not be charged at these exits, it could be possible.

I learned a lot from this session.  And I am glad that I went.  Admittedly, Billy and I were most likely the youngest and also non-politician while we were there.  It was a good experience to attend and whether your are a roadgeek or not I would encourage anyone in the general public to go to these when they are able.  And don't be afraid to offer suggestions in the comment sheet or ask questions.

Comments

Bob Malme said…
The reaction of the attendees sounds similar to a public session I attended a couple weeks ago about MBTA fare increases and bus, subway and commuter bus and rail service cuts. Needless to say not too many people approved. But it was a civil conversation and people felt involved in the decision making process, even if they didn't like what was being proposed.
I attended one of the first I-95 information sessions when the report on how to fix the road was just started. Most people there thought the toll option would be the inevitable choice.
James Mast said…
Interesting idea to toll the ramps for the routes to the coast. However, I don't agree about the I/US-74 one. That one was just recently built. If they were to attempt to toll that one, I would demand that NCDOT pays back the federal money they used to build it first.
Anonymous said…
While I agree there will be a need for new revenues, I don't agree with tolling I-95 or any other highway. I think a better solution would be to increase vehicle registrations, increase the gas tax a penny or two, and increase the state sales tax 1%. I know taxes aren't popular but neither are tolls.
Mapmikey said…
Although I see the logic in tolling exits for beach routes, one drawback is that two of those - US 158 and US 70 - are also major business locations where travelers would be getting off only to eat or gas up, then getting back on 95. This would result in addition cost to through motorists.

Even if people didn't shunpike based on the tolls, I for one will be avoiding 95 once construction starts which will (apparently) be ongoing for a number of years. I am a veteran of the unending paving improvement of I-95 south of Emporia.

Mapmikey
Anonymous said…
I fail to the need for more lanes in NC. Do the existing lanes need to be better maintained and perhaps widened a bit; yes.
Anonymous said…
Raise gas tax? NO.
Mainly because people traveling on the road (20%) go straight through - without stopping. I would estimate that 50% of the cars are crossing the state, they may stop for food or something yet they are too many trucks and cars just using the road and not paying anything into upkeep.

if you don't think it needs an extra lane, you may not have driven it lately.

The bridges could be built for the eight lanes from VA to SC. The widening can be done is stages 6 lanes then 8 as needed.

I would rather see 6 lanes the entire length first rather than 8 lanes in the center with the Northern and Southern ends still at 4 lanes.

Tolls are better, however I think 19 bucks is a bit steep.

Popular posts from this blog

Interstate 40's Tumultuous Ride Through the Pigeon River Gorge

In the nearly 60 years Interstate 40 has been open to traffic through the Pigeon River Gorge in the mountains of Western North Carolina, it has been troubled by frequent rockslides and damaging flooding, which has seen the over 30-mile stretch through North Carolina and Tennessee closed for months at a time. Most recently, excessive rainfall from Hurricane Helene in September 2024 saw sections of Interstate 40 wash away into a raging Pigeon River. While the physical troubles of Interstate 40 are well known, how I-40 came to be through the area is a tale of its own. Interstate 40 West through Haywood County near mile marker 10. I-40's route through the Pigeon River Gorge dates to local political squabbles in the 1940s and a state highway law written in 1921. A small note appeared in the July 28, 1945, Asheville Times. It read that the North Carolina State Highway Commission had authorized a feasibility study of a "...water-level road down [the] Pigeon River to the Tennessee l

Mines Road

Mines Road is an approximately twenty-eight-mile highway located in the rural parts of the Diablo Range east of the San Francisco Bay Area.  Mines Road begins in San Antonio Valley in Santa Clara County and terminates at Tesla Road near Livermore of Alameda County.  The highway essentially is a modern overlay of the 1840s Mexican haul trail up Arroyo Mocho known as La Vereda del Monte.  The modern corridor of Mines Road took shape in the early twentieth century following development of San Antonio Valley amid a magnesite mining boom.  Part 1; the history of Mines Road Modern Mines Road partially overlays the historic corridor used by La Vereda del Monte (Mountain Trail).  La Vereda del Monte was part of a remote overland route through the Diablo Range primarily used to drive cattle from Alta California to Sonora.  The trail was most heavily used during the latter days of Alta California during the 1840s. La Vereda del Monte originated at Point of Timber between modern day Byron and Bre

Interstate 210 the Foothill Freeway

The combined Interstate 210/California State Route 210 corridor of the Foothill Freeway is approximately 85.31-miles.  The Interstate 210/California State Route 210 corridor begins at Interstate 5 at the northern outskirts of Los Angeles and travels east to Interstate 10 in Redlands of San Bernardino County.  Interstate 210 is presently signed on the 44.9-mile segment of the Foothill Freeway between Interstate 5 and California State Route 57.  California State Route 210 makes up the remaining 40.41 miles of the Foothill Freeway east to Interstate 10.  Interstate 210 is still classified by the Federal Highway Administration as existing on what is now signed as California State Route 57 from San Dimas south to Interstate 10.  The focus of this blog will mostly be on the history of Interstate 210 segment of the Foothill Freeway.   Part 1; the history of Interstate 210 and California State Route 210 Interstate 210 (I-210) was approved as a chargeable Interstate during September of