Had a chance this past weekend to drive the southern end of I-93 from Braintree to Canton and back. With the opening of the new fourth lane northbound between I-95 and MA 24 on Wednesday (11/14), this portion of the '128-Add-a-Lane' project is almost complete. (For a list of upcoming opening dates for '128 South' between MA 109 and MA 24, see this blog post , a response to a question I had after taking this road trip). The signage along this stretch of I-93 has now, with an exception or two, been completely replaced. 1. New signage southbound from MA 24 to I-95 Two of the final signs to go in southbound have been the advance overhead signs for Exit 3, Houghton's Pond. Signs 1/2 mile before the exit have been placed both on the MA 24 on-ramp and here, along I-93: One of the signs not updated yet is the 1 mile advance sign, which may not be the responsibility of this project. After the MA 24 ramp merge they have added a pair of I-93/US 1 reassurance markers on e
Because every road has a story.