Skip to main content

The Lincoln Highway Bridge Rails


The Lincoln Highway Bridge Rails are presently located at the eastbound truck parking area near Mile Marker 6 of Interstate 80 in Washoe County, Nevada.  These bridge rails were part of the Mogul Road culvert which was completed in 1914 as part of the Northern Branch of the Lincoln Highway.  The railings were intended to be a common feature of the Lincoln Highway but ultimately were only installed at one other location in Tama, Iowa.  During 1926 US Route 40 would be carried for a time through the Lincoln Highway Bridge Rails.  The bridge rails were abandoned during a realignment of US Route 40 during the 1930s but were ultimately salved during the construction of Interstate 80 in 1970. 




Part 1; the history of the Lincoln Highway Bridge Rails

During 1912 Indiana Businessman Carl G. Fisher conceptualized the Lincoln Highway as a major transcontinental Auto Trail.  The Lincoln Highway was formally dedicated on October 31, 1913, and was aligned west of Fallon via split branches over the Sierra Nevada Mountains.  The original northern branch of the Lincoln Highway (displayed in blue) is shown on the Lincoln Highway Association's Official Map from Reno heading west to Verdi onwards to the Dog Valley Grade into California.



West of what is now Nevada State Route 647 (formerly US Route 40) the north branch of the Lincoln Highway followed Southern Pacific Railroad along Mogul Road through the namesake siding community.  


During 1914 a then new culvert bridge would be commissioned near Mogul along the Lincoln Highway.  Contractor A.F. Niedt paid for the culvert to have unique railings installed which read "Lincoln Highway."  The impetus for Niedt's decision to install the railings was Washoe County electing to delay signage of the Lincoln Highway in their jurisdiction.  

The Mogul culvert is often touted as the first bridge structure completed as part of the Lincoln Highway.  Lincoln Highway Association President H.E. Frederickson visited the structure shortly after it was complete in 1914.  Frederickson was impressed by the structure and desired to have all Lincoln Highway bridges modeled after the Mogul culvert.  Ultimately only one other like structure was ever built on the Lincoln Highway during 1915 in Tama, Iowa. 

H.E. Frederickson can be seen with Washoe County Commissioner J.O. Sessions at the Mogul culvert in a 1914 photo (courtesy Jim Bonar collection). 


During 1921 the Victory Highway would be multiplexed through Mogul with the north branch of the Lincoln Highway.  The US Route System was formally approved by the American Association of State Highway Officials (AASHO) on November 11, 1926.  The approval of the US Route System formally brought US Route 40 into existence which overlapped the north Lincoln Highway and Victory Highway west of Reno.  

US Route 40 west of Reno to the California state line would be realigned during the 1930s.  Segments of realigned highway would bypass structures which were part of the Lincoln Highway which included Mogul Road and the Mogul culvert.  The structure can be seen in a state of abandonment below (year unknown, courtesy Jim Bonar collection).


Amid construction of Interstate 80 in the Reno area the railings from the Mogul culvert were salvaged by the Nevada Department of Highways (now Nevada Department of Transportation).  The rails were relocated approximately 0.9 miles west to the eastbound Interstate 80 truck parking area.  



Part 2; a visit to the Lincoln Highway Bridge Rails

The Lincoln Highway Bridge Rails can be found onto eastbound Interstate 80 at the truck parking area near Mile Marker 6. 


A closer up look at the salvaged rails.  



The interpretative information sign regarding the Lincoln Highway Bridge Rails. 

Comments

Popular posts from this blog

Bleriot Ferry - Alberta

  Alberta operates six ferries scattered throughout the province. Roughly twenty to twenty-five kilometers up the Red Deer River from the town of Drumheller is one of the most scenic ferry crossings in all of Wild Rose Country, the Bleriot Ferry. Using the North Dinosaur Trail (Alberta Highway 838, or AB 838), the Bleriot Ferry provides a scenic river cruise of sorts in the Canadian Badlands. The Bleriot Ferry started operating in 1913 as the Munson Ferry when a few bridges crossed the Red Deer River. The ferry was started by Andre Bleriot, the brother of famed early aviator Louis Bleriot, who became famous for being the first person to fly over the English Channel. At the time, the Alberta provincial government commissioned local residents to run the ferries. There were several ferries along the Red Deer River, and not only did they serve as vital transportation links, but they also served as local social hubs, since everyone had to take the ferries to go places. Over time, as the...

The Pollasky Bridge

The Pollasky Bridge near modern day Friant is a ruined highway bridge which was completed during early 1906 as part of the Fresno-Fresno Flats Road.  The structure is one of the oldest known arch concrete spans to have been constructed in California.  The bridge briefly carried California State Route 41 following the destruction of the Lanes Bridge in 1940.  The Pollasky Bridge itself was destroyed by flooding during 1951, but the ruins can still be found on the Madera County side of the San Joaquin River.   Pictured as the blog cover is the Pollasky Bridge as it was featured in the 1913 book "The Concrete Bridge."  The structure can be seen crossing the San Joaquin River near Friant below on the 1922 United States Geological Survey Map.   Part 1; the history of the Pollasky Bridge The Pollasky Bridge site is near modern day Friant of Fresno County.  The community of Friant was established as Converse Ferry during 1852 on the San Joaquin Rive...

I-73/I-74 and NC Future Interstates Year in Review 2024

Welcome to another annual review of progress in constructing North Carolina's New and Future Interstate routes. While 2024 was not too exciting, with no new segments of major routes opening, there was 1 new interstate signing, another proposed new interstate route, and the near opening of a new segment for 2 routes. As tradition, I will start off with a review of what happened with I-73 and I-74 and then move on to the major news of the year about the other new and future routes. Work continued on the I-73/I-74 Rockingham Bypass through the year. The last few months have been hoping for news of its opening before 2025, without luck. Signs of its near completion included the placement of new signs, many with interstate shields uncovered, along the Bypass and intersecting roadways. For example, these went up along US 74 East: Overhead signage at Business 74 exit which contains the future ramp to I-73 North/I-74 West. Signage was also updated heading west on US 74 approaching the unop...